Skip to content
Firm quotes on solar detach and reset, usually in 48 hours (708) 847-6002
Solar Panel Removal Richton Park logo

For roofing outfits

Contractor Detach and Reset in Richton Park

Need the array gone before your crew shows up? We clear it, store it and return it after your last course of shingles.

Roofer carrying a bundle of shingles across a roof with stacked shingle packs

Why Should a Roofing Crew Hand Off the Solar?

Because it is a different craft. Your crew can strip and shingle a roof faster than anyone, but disconnecting a solar system, pulling conduit and lifting modules without stressing a frame or a connector is careful, specialized work. Hand it to us and keep your crew doing what it does best. Here is how it goes. Phone in the property, how many modules sit up there and when your guys plan to strip it. We look at the array, hand you a per-panel figure that slots right into your estimate and reserve a takedown day before your crew mobilizes. On that day, the system is powered off and unhooked, and every module, rail and length of conduit comes down with a label on it before storage. Your crew arrives to a bare deck. When the roof is finished, call us back. We set new mounts and flash each penetration, return the modules to their original places, reconnect and test production. If rain pushes your schedule, we move with it. We talk directly with your foreman. The homeowner stays your client, and at the end of a job that ran on your timeline, they have a working system.

What Does Your Company Get?

The solar side of the reroof, handled from start to finish.

  • Per-panel numbers

    A unit price that slips easily into your bid.

  • Removal ahead of you

    The array is gone before your crew sets up.

  • Clear roof surface

    Every rail, clamp and wire run gone before shingles come off.

  • Off-site storage

    Modules and hardware labeled and kept away from your site.

  • Reinstall after your finish

    New mounts and flashing set once your roof is done.

  • Foreman to foreman

    Schedule shifts sorted out directly with your crew lead.

  • Production test

    The system confirmed working before we leave the property.

  • Claim breakdowns

    Itemized solar documentation when the job is a storm claim.

How Do We Fit Into Your Job?

  1. You send the details

    Property, module count and strip date. A per-panel number comes back after our look, usually within 48 hours.

  2. We clear the deck

    Ahead of your start, power is cut and every module and rail comes off, labeled and hauled to storage.

  3. We return when you call

    Let us know the roof is done. Fresh attachments and flashing get set, modules return, and wiring plus output get checked before we leave.

Why Do Roofers Keep Calling Us Back?

  • We show up when promised

    Your start depends on our removal, so we treat that date seriously.

  • Clean work

    Your crew never has to clear away what we left behind.

  • Your client stays your client

    The solar is our part. The customer relationship is yours.

  • Per-panel numbers
  • Removed ahead of you
  • Bare deck
  • Tested at the end

Is There Solar on Your Next Reroof?

Give us the property, module count and your start date. A per-panel figure and a removal day that suits your schedule will follow.